Since NK Liftinterieurs had grown out of its existing building, we were commissioned to build an office with showroom and production space. After a construction period of only twenty weeks, the new business premises were completed turnkey.
Our regular chain partners were involved in the realization of the building. In the design and permit phase we formed a construction team with 4D Architects. This enabled us to optimize the design based on the wishes of the customer and the requirements of the municipality.
The large glass curtain wall provides a transparent and timeless appearance. The building is equipped with high-quality installations. The current arrangement of the machines ensures the most efficient use of space in the production hall.