In assignment of Systabo B.V., Voortman Steel Construction participated in the construction of the more than 40,000 m2 building, at a sight location next to the A27 motorway.
Our assembly team erected the 18,000 tonnes steel structure within 15 weeks’ time. We also supplied and mounted the floors. The sustainable building is fully covered with solar panels and is delivered with the BREEAM certificate Very Good.