Building together with a reliable partner
The multistorey car park is often the first as well as the last contact with a location. The accessibility and availability of a parking facility are therefore important for the visitor’s impression. That is why our parking specialists conduct an analysis first in order to identify your needs. We use this as the basis for the design and the delivery of your multistorey car park.
We are happy to take work of your hands where possible throughout the entire build process. Our partner EZ Park will be happy to advise you on operation and management after completion of your new multistorey car park too. In short: we will turn your parking problem into a parking plan!
Building together with a reliable partner
If you opt for EZ Park and Voortman Steel Construction for your aboveground multistorey car park, then we will ensure that your parking problem becomes a parking plan. We ask the right questions and then get down to work with this information. We will create an appropriate design based on a thorough analysis of your parking requirement and your wishes and desires.
Design phase
We identify your wishes and basic principles in the design phase. Our team of parking specialists will analyse your parking requirement. This will give us an insight into your requirements regarding:
- Safety (fire safety, safe layout, but also socially safe)
- Modular construction: ability to extend
- Flexible layout
- Column-free parking
- Logical routing
- Good visibility: long sightlines.
We will create an appropriate design on this basis plus a summary or the associated investment costs.
Build phase
Once the design has been approved, we draw up a purchase contract and an appropriate schedule. We can also think collaboratively with you about finance for your multistorey car park. Once the contract has been accepted, we set delivery in train. This might cover applying for permits and the technical elaboration of drawings. In addition to supplying and assembling the steel structure, we also look after additional tasks. We ensure that the nuisance is kept down to a minimum when carrying out our work. There are various completion points during build with your agreement. We can then deal with any interim completion issues on the job. This enables us to ensure a perfect final completion.